|
|
www.design-reuse-embedded.com |
Slow India may lose Cricket wafer fab
Cricket Semiconductor, an analog and power pure-play foundry project that was being prepared for touch down in India, is running late and could end up being constructed in a different country.
By Peter Clarke, EETimes Europe, Jan. 31, 2017 –
The plan, announced in 2015, was for Cricket to break ground for an analog and power circuit wafer fab in 2016 - with Indore in Madhya Pradesh as the likely location - and that it would begin producing chips in 2018.
"The project has taken longer than we had anticipated, and it may continue to move at a pace that is slower than our preference," Lou Hutter, a former Texas Instruments executive working on the project, said in email correspondence with EE Times Europe.