|
Overview
Meerkat is an in-situ Monitors IP platform for a real time control of Timing critical paths, Activity critical paths or User defined critical path in digital electronic device. Meerkat, non-intrusive digital elements based on standard cell libraries, are inserted seamlessly in the design of digital devices with standard EDA tools.
From user defined monitoring criteria, Meerkat enables ultra-fast Short loop for Fail Safe Operational mode, Fast loop for Adaptive Voltage-Scaling (AVS) or Body-Bias (ABB) & Real-time reliability reporting for silicon Lifecycle analytics to protect, control your device and report any deviation of your device during its entire lifetime.
From user defined monitoring criteria, Meerkat enables ultra-fast Short loop for Fail Safe Operational mode, Fast loop for Adaptive Voltage-Scaling (AVS) or Body-Bias (ABB) & Real-time reliability reporting for silicon Lifecycle analytics to protect, control your device and report any deviation of your device during its entire lifetime.
Please sign in to view full IP description :
Tech Specs
Part Number | MEERKAT_1_SLG_IN-CHIP_MONITORING |
Short Description | Meerkat is an in-situ Monitors IP platform for a real time control of Timing critical paths, |
Provider |